Home
Starfish III, IV & V Condo Association
Completed Projects & Associated Owner Savings
Year Work Completed Workers Hours Total Hours Owner Savings Owner Savings Owner Savings Owner Savings            
2008 Fence repair    
Fall Ceiling repair building 3, unit 204    
  Concrete ceiling and rust repairs - garage area building 5    
  Stairway paint touch up    
  Stairway panel and clip repair    
  Deck touch ups 8 5 40 ########  
Spring Power washed building 3 stairs as prep for painting    
  Removed the dead tree from the front of building 4    
  Clean up around the buildings and dumpster areas    
  Installation of additional landscape 6x6 timbers for buildings 3 & 5    
  Power washed all three garage areas    
  Touched up the white garage ceilings and walls    
  Painted the wood plumbing pipe boxes in all three garage areas    
  Mulched flower beds in all three buildings    
  Reparied the trash enclosures for buildings 4 & 5    
  Planted flowers in front of building 4    
  Touched up the brown paint on the steps and railings in buildings 4 & 5    
  Evaluated a plumbing drain leak in the east garage bay of building 5 32 6 192    
  Total    232  $ 12,992    $               12,992
2007 Yellow parking blocks repainted              
Fall Garage parking spaces relined    
  Buildings 3 & 5 roof hatches repaired, remounted and reinforced     
  Buildings 3, 4 & 5 roof hatches primed and painted    
  Buildings 3, 4 & 5 roofs inspected and debris removal    
  Roof seams re-tarred and rotten beam replaced    
  Building 4 leaking spigot repaired    
  Missing and burned out light bulbs replaced     
  Rain spouts cleaned out and re-secured     
  General clean up of flower beds    
  Miscellaneous painting 11 8 88    
Spring New shed assembled and installed on new foundation    
  Flower beds weeded and mulched    
  New flowers planted and trees/shrubs trimmed    
  Parking block numbers repainted    
  Parking number signs switched for space rotation    
  Replacement of metal clips on electrical conduit    
  Stairs touched up in all three buildings    
  General clean up    
  Painting of back fence, posts and rails    
  Removal of parking block that was too close to building 5    
  Repair and insulation of open holes in garage ceilings    
  Repair and straightening of conduit on building 5 28 8 224    
  Totals     312  $ 17,472      $               17,472
2006 Touch-up painting of back fence    
  Touch-up painting of steps on each building    
  Touch-up painting where old signs removed    
  Painting of electrical boxes Buildings 3, 4 & 5    
  Conduit clip replacement Buildings 3 & 5     
  Conduit painted Building 5    
  Electric box hinges sealed with clear sealer    
  Place hinges and clasp on Building 3 water shut off door    
  Concrete steps sealed    
  Parking light on Building 5 replaced    
  Parking light on Building 3 serviced     Saved
  Replaced Thermostat and box for heat tape on Building 5    
  Installed Shipley Management signs on Buildings 3 & 5 16 8 128  $   7,168  
  Repaired holes in building 5 stairwell walls  3 4 12  $     672   2008  $ 12,992
  Changed parking sign blocks and renumbered spaces  1 2 2  $     112   2007  $ 17,472
  General weeding, mulching and clean up  4 7 28  $   1,568   2006  $ 11,704
  Parking lot stones and grading 5 3 15  $     840   2005  $ 11,144
  Touched up paint in stairs for building 3 & 4  4 6 24  $   1,344   2004  $ 12,208
  Totals     209  $ 11,704    $               11,704 2003  $   2,240
2005 Installed new light fixtures in garage areas   2 4 8  $     448   Total   $ 67,760
  Repaired wind damaged roof hatch in building 5 3 1 3  $     168  
  Painted roof hatch areas   3 4 12  $     672  
  Board walks for shower areas   2 4 8  $     448   Assumptions
  Railing boards  3 8 24  $   1,344    $   40.00 Hourly Base Rate
  Painting 2 buildings touch up  2 8 16  $     896   40% Mgmt Fee
  Paint Building 5 Steps  4 16 64  $   3,584    $   56.00 Total Hourly Rate
  Landscaping and mulch   2 8 16  $     896  
  Electric box shingles 2 6 12  $     672  
  Painting parking blocks    2 3 6  $     336  
  Changing numbers and signs    2 1 2  $     112   16 people in sept and nov
  Power washing    2 8 16  $     896  
  Treating landscaping ties    2 4 8  $     448   Touch-Up Painting of back fence
  Treating concrete steps    2 2 4  $     224   Touch-Up Painting of steps on each building
  Totals     199  $ 11,144  $               11,144 Touch-Up Painting where old signs removed
2004 Painted new lines for parking spaces in garage areas    1 4 4  $     224   Touch-Up Painting of electrical boxes
  Producing new number signs  2 8 16  $     896   Conduit metal clips replacement and Conduit straightening ( front of 
  Changing numbers and signs  2 1 2  $     112   Buildings III and V )
  Tree removal Building 3     4 4 16  $     896   Conduit painted ( front of Building V )
  Garage area box construction  4 12 48  $   2,688   Electric Box hinges sealed with clear sealer
  Garage powerwashing & painting 8 16 128  $   7,168   Place hinges and clasp on Building III water shut off door
  Hindge replacement   2 2 4  $     224   Concrete steps sealed
  Totals     218  $ 12,208  $               12,208 Parking light on Building V replaced
2003 Parking lot stones and grading 2 4 8  $     448   Parking light on Building III serviced
  Tree removal - Buildings 4 and 5   8 4 32  $   1,792   Replaced Thermostat and box for heat tape on Building V
  Totals     40  $   2,240      $                 2,240 Installed Shipley Management Signs on Buildings III and V